46 KBP Series Manual


A manual gas control valve must be placed in the
gas supply line to the water heater. A union can be
used on the connecon above the shut o valve
for the future servicing or disconnecon of the
unit.
Check the type of gas and the gas inlet pressure
before connecng the water heater. If the water
heater is not of the gas type that the building is
supplied with, DO NOT connect the water heater.
Contact the dealer for the proper unit to match the
gas type.
Check the gas supply pressure immediately
upstream at a locaon provided by the gas
company. Supplied gas pressure must be within
the limits shown in the Specicaons secon of
this manual with all gas appliances operang.
Before placing the appliance in operaon, all joints
including the heater must be checked for gas
ghtness by means of leak detector soluon, soap
and water, or an equivalent nonammable
soluon, as applicable. (Since some leak test
soluons, including soap and water, may cause
corrosion or stress cracking, the piping shall be
rinsed with water aer tesng, unless it has been
determined that the leak test soluon is non-
corrosive.)
Use approved connectors to connect the unit to
the gas line. Purge the gas line of any debris
before connecon to the water heater.
General Instrucons
WARNING
1. A licensed professional must install the gas
supply.
2. Turn o 120v power supply.
3. Turn o the gas.
4. Gas is ammable. Do not smoke or provide other
ignion sources while working with gas.
5. Do not turn on the water heater or gas unl all
fumes are gone.
Size the gas pipe
The gas supply must be capable of handling the enre
gas load at the locaon. Gas line sizing is based on
gas type, the pressure drop in the system, the gas
pressure supplied, and gas line type. For gas pipe
sizing in the United States, refer to the Naonal Fuel
Gas Code, NFPA 54. The below informaon is provid-
ed as an example. The appropriate table from the
applicable code must be used.
1. For some tables, you will need to determine the
cubic feet per hour of gas required by dividing the
gas input by the heang value of the gas
(available from the local gas company). The gas
input needs to include all gas products at the lo-
caon and the maximum BTU usage at full load
when all gas products are in use.
2. Use the table for your gas type and pipe type to
nd the pipe size required. The pipe size must be
able to provide the required cubic feet per hour
of gas or the required BTU/hour.
Example:
The heang value of natural gas for your locaon is
1000 BTU/FT
3
. The gas input of the RUR98i is 199,000
BTU/HR. Addional appliances at the locaon require
65,000 BTU/hr. Therefore the cubic feet per hour =
(199,000 + 65,000) / 1000 = 264 FT
3
/HR. If the pipe
length is 10 feet then the 3/4 inch pipe size is capable
of supplying 264 FT
3
/HR of natural gas.
Gas Input of all gas products (BTU / HR)
Heang Value of Gas (BTU / FT
3
)
Cubic Feet
per Hour =
(CFH)
Any compound used on the threaded joint of the
gas piping shall be a type that resists the acon of
liqueed petroleum gas (propane / LPG).
The gas supply line shall be gas ght, sized, and so
installed as to provide a supply of gas sucient to
meet the maximum demand of the heater and all
other gas consuming appliances at the locaon
without loss of pressure.

If in doubt about the size of the gas line, refer to an
approved pipe sizing chart