Rinnai RUR98e (REU-KBP3237WD-US) Installation Manual Page 32

  • Download
  • Add to my manuals
  • Print
  • Page
    / 160
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 31
32 KBP Series Manual

Locate the vent and intake air terminaon using the
following guidelines:
1. For installaons with mulple Tankless Water Heaters,
refer to Figure 16 for proper exhaust and combuson
air piping placement.
2. Roof penetraon of the vent and intake air piping
should be such that the combuson air intake is a
minimum 12” (30.5 cm) from the adjacent vent pipe of
the other water heater. For installaons in the U.S.
refer to Figure 16. For installaons in Canada, refer to
clearances required by CAN/CSA B149.1.
-


Locate the vent and intake air terminaon using the
following guidelines:
1. The total length of the vent or intake air piping must
not exceed the limits given in maximum equivalent
vent length tables. The equivalent length for 90° el-
bows and terminaon associated with the respecve
vent and intake air piping arrangement MUST be
subtracted from total length listed in maximum
equivalent vent length tables.
2. For roof terminaons installed as shown in gure to the
right, the intake air piping must terminate using a tee
or combinaon of elbows. The terminaon must be
installed 12” (30.5 cm) minimum above roof or the
highest ancipated snow level.
3. The vent must terminate vercally with a coupling to
facilitate the bird screen and must be located 12” (30.5
cm) minimum above the combuson air inlet.
4. The vent and intake air terminaons must be
located a radial distance of 12” minimum (30.5 cm)
from outer wall of vent terminaon to outer wall of
combuson air intake terminaon.
-


Cered PVC/CPVC Vent Terminaon Opons (connued)
All gures shown in this secon are in reference to at
roofs. For heights of venng passing through a pitched
roof, refer to NFPA 54/ANSI Z223.1-09 (table and gure
12.7.2), CSA B149.1-10 (gure 8.1) Pitched Roof Termina-
on Clearances Diagram (this manual)

12” min
above air
intake
opening
12” min
12” above
grade or
ancipated
snow level
Vent Terminaon
Combuson air terminaon
12” min
above air
intake
opening
12” above
grade or
ancipated
snow level
Combuson Air Terminaon
Exhaust Vent Terminaon
12” min
12” min
above air
intake
opening
12” above
grade or
ancipated
snow level
Vent Terminaon
Combuson air terminaon
12” min
12” min
Page view 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 159 160

Comments to this Manuals

No comments