Rinnai RHFE-1001FA Installation Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
DIMENSIONS
5
14 1/16" (357.5)
12 7/16" (316)
13" (330)
7 7/8" (200)
4 9/16" (116)
36 5/8" (930)
28 7/16" (723)
26 3/8" (670)
15 5/8" (397)
11 13/16" (300)
GASCONNECTION
10 7/8"
(R277)
9 13/16" (250)
6 1/2" (165)
6 5/16"(160)
13 3/4" (R350)
Cavity Opening
FLUE MANIFOLD POSITION
Center of hole for flue manifold can be drilled
anywhere within the shaded area. (To avoid
studs, etc.)
FOR WEATHERBOARD WALLS DRILL
THROUGH CENTER OF WEATHER BOARD
FROM OUTSIDE, THEN DRILL FROM
INSIDE THROUGH PLASTERBOARD.
Before drilling the flue hole, check for water
and gas pipes as well as electric cables. Use
a 3 1/8" (80mm) drill for hole through wall.
Flue Hole
3 1/8"
(80mm)
inches (mm)
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 59 60

Comments to this Manuals

No comments