Rinnai SPLIT SOLAR Installation Manual Page 50

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 49
Rinnai Australia - 48 - Solar Split Systems Operating / Installation Manual Version 9 - 21/11/12
CHECKING SOLAR PUMP OPERATION
1. Ensure hot and cold sensors are connected as shown Figure 39.
2. Activate power supply.
3. Pumps will operate when solar energy is available to be collected. Pump operation can be checked by
placing the end of a screw driver to the pump body and the other end of the screw driver near your
ear.
ADJUSTING FLOW CONTROL VALVE
The purpose of the flow control valve is to allow the water flow
rate through the collectors and storage cylinder to be
controlled to optimise the performance of the system. The
optimum flow rate for the system will depend on the type of
system (electric or gas boost), the number of collectors, and
the location of the installation (see the solar zone shown in
Figure 40).
Figure 40 - Australian Solar Zones
The flow control valve needs to be adjusted while the pump is
operating. The flow rate valve is read at the bottom of the
baffle float as shown in Figure 41 Using a flat bladed screw
driver turn the screw on the valve until the value from Table 10
is achieved.
Figure 41 - Adjusting Flow Control Valve
The installer will need to set the flow rate to the value shown in Table 10 below.
If leaks are detected the system must be drained and leaks repaired before the
system is refilled. If this is necessary, cover the solar collectors with packaging
cardboard or a tarp to prevent them from heating which could result in steam or hot
water being discharged from fittings.
If the solar pump does not activate the system can still be commissioned as detailed in
these instructions, but solar preheating will not be available until the pump and
controller operate.
Table 10 - Optimum Flow Rate (Litres/min).
No. of Collectors
Zones
1, 2 & 3
Zone 4
Gas Boosted
1 0.50 0.50
2 1.25 1.25
3 2.10 2.10
1 x SP250A when used with
an SG175, ESG175, SG215
or ESG215 cylinder
0.50 0.35
CAUTION
NOTE
INSTALLATION & MAINTENANCE - GAS BOOSTED SYSTEMS
Page view 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 67 68

Comments to this Manuals

No comments