Rinnai V2526W User Manual

Browse online or download User Manual for Water heaters & boilers Rinnai V2526W. Rinnai RGB-25U-C Installation Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 3
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Rinnai Corporation • 103 International Drive • Peachtree City, GA 30269 • Toll-Free: 1-800-621-9419 • Fax: 678-829-1666 • www.rinnai.us
1/2008 1 INST-RGB-25U
INSTALLATION INSTRUCTIONS
RGB-25U Recess Box
1. Determine a suitable location meeting the installation clearances shown in Figure 1 below.
Local building codes may restrict the clearances shown below. If you are unsure if the clearances
are acceptable in your area, consult with local building officials to verify prior to proceeding with
installation.
Clearance to gas meter and electric meter shall be in accordance with local codes and the
requirements of the gas supplier or electric supplier.
2. Drill 4 holes spaced out along the length of each side of the recess
box. The recess box is designed to be fitted between 2 studs and
secured through these holes. (Figure 2)
3. Bottom Hole Access: Use the provided template to drill the
appropriate holes for water, gas and electric access.
Side Hole Access: Identify the appropriate hole locations for water,
gas and electric. Watch for interference with the framing stud
before drill the holes.
4. All recess box penetrations must be sealed to prevent moisture
from entering the wall.
5. Apply a 3/8” bead of sealant along the back of the box flange.
32” (0.91 m) to a soffit or eve vent; or
to a porch or deck
8.5” (216 mm) to
inside corner
12” (0.30 m) to ground / snow line
12” (0.30 m) to window or door
that may be opened
12” (0.30 m) to air inlets or vents
All dimensions are from edge of box
Clearances
RECESS
BOX
Figure 1
Note: The clearance to
combustibles of the water
heater/recess box assembly
are zero inches to all surfaces
of the recess box. A 24”
clearance to combustibles
and non-combustibles must
be maintained from the front
of the unit for servicing.
1 recess box
1 mounting bracket
1 mounting screw
4 lock nuts
4 washers (11/32)
1 locking bracket
The RGB-25U includes:
Figure 2
mounting
bracket
and
screw
washers
Figure 3
drill
screw
holes -
each
side
For the: R94LSe REU-VA2535WD
R75LSe REU-VA2528WD
R/C85e REU-V2532W(C)
R/C85ePLUS REU-V2532WD(C)
R70e REU-V2526W
Page view 0
1 2 3

Summary of Contents

Page 1 - RGB-25U Recess Box

Rinnai Corporation • 103 International Drive • Peachtree City, GA 30269 • Toll-Free: 1-800-621-9419 • Fax: 678-829-1666 • www.rinnai.us 1/2008 1 INST

Page 2 - Figure 4

2 INST-RGB-25U 6. Position and secure the recess box to the building structure with suitable screws (galvanized or stainless steel) through the 8

Page 3 - V2532W(C), V2526W

Rinnai Corporation • 103 International Drive • Peachtree City, GA 30269 • Toll-Free: 1-800-621-9419 • Fax: 678-829-1666 • www.rinnai.us 1/2008 3 INST

Comments to this Manuals

No comments